Friday 25 December 2009

Bridge Spec

The specifications of the bridge weren't up to carrying to cement trucks (there's another on the other side, or a second trailer, I didn't really understand the layout to be honest).

1 comment:

  1. I think that concept doesn't exist here. Like the crane that was there to pull one of the trucks out. Totally underequiped for the job.

    As it turns out, it was two trucks. The first had the cement carriage basically smush the driver and his passenger in the cab as momentum carried it forward as the cab went into the water. The second truck was following behind and was just unable to stop in time.

    ReplyDelete